Close Menu
Retrofit HomeRetrofit Home
    • Features
    • Industry News
    • Manufacturer News
    • Products
    • Online Exclusives
    What's Hot

    Electric Fireplace’s Flames Flicker and Crackle

    Brava Roof Tile Products Earn ICC-ES Evaluation Report ESR-4756

    Architecture and Design Industry Recognizes NanaWall’s Multi-slide Glass Wall

    Facebook X (Twitter) Instagram Pinterest YouTube
    • About
    • Contact Us
    • Media Kit
    Subscribe
    X (Twitter) Facebook LinkedIn YouTube Instagram
    Retrofit HomeRetrofit Home
    • Features
      • Bath
      • DesignVibes
      • Exterior
      • Kitchen
      • Multifamily
      • Outdoor Living
      • Projects
      • RoomReveal
      • Single Family
      • Unique
      • Viewpoint
    • News
      • Industry
      • Manufacturer
    • Online Exclusives
      • Blog
    • Archives
      • Winter 2026
      • Fall 2025
      • Summer 2025
      • Winter 2025
      • Fall 2024
      • Summer 2024
      • Winter 2024
      • Fall 2023
      • Summer 2023
      • Spring 2023
      • Winter 2023
      • Fall 2022
      • Summer 2022
      • Spring 2022
      • Fall 2021
    • Products
      • Appliances
      • Electrical
      • Equipment
      • Fixtures
      • Flooring
      • Glass
      • HVAC
      • Insulation
      • Interior Design
      • Lighting
      • Outdoor Amenities
      • Paints/Coatings
      • Plumbing
      • Roofing
      • Safety
      • Siding & Accessories
      • Solar
      • Structural
      • Surfaces
      • Technology
      • Walls & Ceilings
      • Windows/Doors
    • Metamorphosis Awards
      • 2025 Awards
      • 2024 Awards
      • 2023 Awards
      • 2022 Awards
      • 2021 Awards
      • 2020 Awards
      • 2019 Awards
    Retrofit HomeRetrofit Home
    You are at:Retrofit Home » Metamorphosis » 2019 Awards » Laboratory and Field Tests Determine How to Restore a 1903 School’s Facade
    2019 Awards

    Laboratory and Field Tests Determine How to Restore a 1903 School’s Facade

    By Retrofit Magazine EditorNovember 4, 2019Updated:December 12, 20232 Mins Read
    Share
    Facebook Twitter LinkedIn Email Copy Link

    PS183 Manhattan is a 5-story building encompassing 49,000 square feet. The school was built in 1903 and currently serves more than 500 students in kindergarten through fifth grade.

    As part of the investigatory work for this project, New York-based Nelligan White Architects PLLC carefully observed, recorded, and mapped exterior and interior damage at the school. Exterior and interior exploratory probes and spray tests were conducted. Laboratory testing of face brick, face-brick mortar, backup brick and backup-brick mortar for compressive strength, absorption, and chemical composition was requested. Based on the firm’s findings, the team repaired and replaced bastion caps, parapets, face brick, and terra-cotta elements running from the top of the windows of the fourth floor and continuing to the top level.

    PHOTOS: (c) Nelligan White Architects PLLC/Sylvia Hardy

    The preservation goals for this project included the removal of alterations that had occurred during the course of the building’s history, which have changed the historic character of the property. Nelligan White Architects recommended the restoration of the structural and watertight integrity of the building enclosure, particularly the street façade, parapets and roof.

    Because the original distinctive features had been removed or altered, replacement of missing features was substantiated by documentary, physical or pictorial evidence. All considerations were in accordance with the Secretary of the Interior’s Standards for Rehabilitation.

    Retrofit Team

    ARCHITECT: Nelligan White Architects PLLC, New York

    STRUCTURAL ENGINEER: Gilsanz Murray Steficek, New York

    MEP ENGINEER: Clifford Dias Consulting Engineers, New York

    GENERAL CONTRACTOR: LoSardo General Contractors Inc., Brooklyn, N.Y.

    ARCHITECTURAL PRECAST CONCRETE: David Kucera Inc., Gardiner, N.Y.

    Materials

    WINDOWS AND ACCESSORIES: Graham Architectural Products

    MORTARTIGHT THRU-WALL FLASHING (PROTECTED MEMBRANE): LITSCO

    Author

    • Retrofit Magazine Editor

      View all posts
    brick facade facade restoration masonry facade Metamorphosis Awards Nelligan White Architects public school
    Share. Facebook Twitter LinkedIn Copy Link
    Previous ArticleA Beloved Theater within the Kennedy Center Is Updated to Rave Reviews
    Next Article Chicago Union Station’s Renovation Encompasses Preservation and Sustainability

    Related Posts

    40 Years in Publishing

    January 12, 2026

    Meet the 2025 Metamorphosis Awards Judges

    November 10, 2025

    A Celebration of the Past

    November 10, 2025
    Leave A Reply Cancel Reply

    Stay In Touch
    • Facebook
    • Twitter
    • YouTube
    • LinkedIn
    • Instagram
    Top Posts

    Outdoor Flooring System Snaps Together to Create Foundation for Ground-level Deck

    April 24, 2024520

    Wood-look Siding Is Made of Vinyl

    March 4, 2024324

    The Importance of Custom Door Craftsmanship

    April 23, 2025318

    A Late 1800s Chicago Public School Is Transformed into 23 Apartments Featuring Classic Classroom Details

    November 6, 2023
    About Us
    About Us

    retrofit home magazine’s goal is to provide designers, contractors and others education about and insight into retrofitting existing homes for the betterment of their owners and communities. Learn More >>

    Facebook X (Twitter) Instagram YouTube LinkedIn
    RetrofitTV

    Experience a world of retrofitting without leaving your desk via our retrofitTV channel. View our current featured video:

    Visit retrofitTV.com to watch more videos from our industry.

    Visit Our Other Publications
    retrofit mag logo
    retrofit tv logo
    © 2026 retrofit home
    • About
    • Contact Us
    • Media Kit
    • Subscribe
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.